The equipment matters just as much as response time for Water Extraction — volume and suction determine how much moisture stays trapped versus how much comes out.
We classify every loss as Category 1, 2, or 3 before extraction begins, then document readings throughout the job.

Truck-mount extraction is standard equipment on every Peru, ME call, not an upgrade.
We identify the contamination category before extraction to determine the correct safety protocol.
Hardwood floors in Peru, ME often don't need replacement if injection drying pulls moisture from beneath the boards fast enough.
You get documented proof of extraction progress, not just a technician's word.
Below is the actual technical scope behind a Water Extraction job in Peru, ME.

We deploy truck-mount pumps for anything beyond a small, contained spill.
Classification testing happens on-site before any extraction equipment starts running.
Weighted extraction tools pull water trapped deep in carpet fiber that a surface pass would miss.
This specialty method can save original hardwood that would otherwise require full tear-out.
We check subfloor moisture at multiple points, not just where the visible water pooled.
You receive documented proof of extraction completion for your own records or an insurance claim.
Tell our Peru, ME dispatcher what happened so the right extraction equipment gets loaded.
Equipment is pre-loaded based on dispatch notes, so there's no delay on arrival.
We test and classify the water, then provide a written quote before extraction begins.
Verification data backs every closed Water Extraction file in Peru, ME.

"They saved our hardwood floor with an injection drying method instead of ripping it all out. Saved us thousands." — Owen R.
"The moisture readings they gave us before and after made the whole process feel legitimate, not just a guess." — Bianca V.
"Truck-mount extraction cleared our flooded basement way faster than the shop vac approach a different company tried first." — Malik J.
A basic pump-out skips classification testing and moisture documentation that Water Extraction includes.
We'll assess whether injection drying is viable before recommending tear-out.
Category 1 is clean water, Category 2 is gray water with some contamination, and Category 3 is sewage or blackwater requiring full PPE.
Yes, every job includes a written report with before-and-after moisture readings.
We prioritize speed specifically because extraction timing affects final outcomes.
We issue a written extraction report formatted for insurance use, not just internal notes.
If you're in or near Peru, an extraction crew can typically respond the same day.

One call starts classification testing and extraction dispatch.
Call +1-844-578-1604